Poinsettia: energy saving trial, costing and quality

Summary

The overall aim is to assess if the lower temperatures from wk 39 will provide energy savings for the UK poinsettia grower without increased quality defects to the crop.

Sector:
Horticulture
Project code:
PO 001
Date:
03 August 2009 - 31 December 2009
Funders:
AHDB Horticulture
Project leader:
DIRK LUDOLPH

Downloads

PO 001 final psg PO 001 Final Report
×